PCPART24 — ETHERCAT EVIDENCE WORKSHEET Version: 2026-11-20 | https://pcpart24.com/engineering-notes Use this worksheet locally. No signup or upload is required. Record observations; leave unknown values as UNKNOWN. Keep original logs. Do not include passwords, access tokens, customer data or full proprietary code. Agree authorization and a transfer method before sharing project files. 1. THE QUESTION One primary symptom: Expected behavior: Observed behavior: First failing transition / time: Last known-good configuration, if available: Recent changes: 2. PLATFORM AND IDENTITY Master stack / version: OS / version / relevant runtime: Slave order / topology: Affected vendor ID / product code / revision: Device firmware version: ESI source / version: Generated master configuration version (ENI or equivalent): 3. FAILURE SNAPSHOT Requested state: Actual state for each affected slave: Exact AL status code and device diagnostic text: Cycle period / synchronization mode requested: Relevant datagram command and configured region: Expected WKC and how the master derives it: Actual WKC for the same datagram: Link error / supply observations, if available: Do not infer expected WKC solely from slave count. A host timer or console log does not establish Distributed Clocks accuracy. 4. PROCESS-DATA COMPARISON (CHECK BOTH DIRECTIONS) RxPDO / master outputs: Active assignments and mapping source: Entry index, subindex, bit width and order: Explicit padding: Total bits / rounded bytes: Configured Sync Manager length: Application field offsets: Master API region / serialized byte count: Host buffer allocation size (keep separate from bytes transmitted): TxPDO / master inputs: Active assignments and mapping source: Entry index, subindex, bit width and order: Explicit padding: Total bits / rounded bytes: Configured Sync Manager length: Application field offsets: Master API region / byte count: 5. AVAILABLE EVIDENCE (LIST TYPES FIRST; DO NOT ATTACH HERE) ESI / generated configuration: AL status / transition log: Active mapping or object-dictionary readout: Short packet capture with relevant datagrams: Application field-layout excerpt: Device documentation references: Which items came from the same failure and configuration: Sharing authorization / redaction requirements: 6. NEXT CONTROLLED TEST Observation to resolve: One proposed change: Safe test conditions / output restrictions: Expected measurable result: Actual result: Remaining unknowns: For paid review fit, send a short non-confidential summary: https://pcpart24.com/engineering/request?offer=ethercat-review Scope, evidence, price and delivery date are agreed before payment. Free calculator: https://pcpart24.com/ethercat-pdo-calculator Illustrative report: https://pcpart24.com/engineering-notes/pdo-offset-worked-example